Structure #32028 - 256th St. Over Taylor Drain

Project Information


Current Status


11/7/16: The construction contract has been awarded to Hoosier Pride Excavating. Ditch work and clearing will be conducted over the winter with construction beginning in the Spring of next year.

Project Location
This structure is located on 256th Street between Anthony Road and Cal Carson Road in Jackson Township.

Reason for Project

Existing structure is a reinforced concrete slab (RCS) with asphalt overlay. Deterioration has occurred at various locations along the coping and abutment. Longitudinal cracking has developed resulting in water leaching into the concrete deck.


Project Scope


The proposed design will widen the roadway and structure to 2 12-foot lanes and minimum 4-foot shoulder. New structure will be able to accommodate a Q100 flood event.

Construction Details


  • Design Firm:  DLZ
  • Inspection Firm:  Hamilton County Highway Department
  • Contractor:  Hoosier Pride Excavating
  • Construction Start Date:  Spring 2017
  • Construction Completion:  Summer 2017
  • Construction Cost:  $650,456

Funding


The design and construction of this project will be funded using GO Bond proceeds.