SS#33065 - Deer Walk Dr. over Webb Ditch

Project Information


Current Status


12/7/16: The construction contract is currently up for bid. Click here for more details.

Project Location


The small structure is located on Deer Walk Dr. off of Joyce Ave. in White River Township
.
Reason for Project
Deterioration has occurred at the joints and invert of the pipe.

Project Scope

Proposed design will keep the same roadway width and length. Structure will be able to accommodate a Q100 flood event.

Construction Details
  • Design Firm: Beam. Longest & Neff
  • Contractor: TBD
  • Construction Start Date: March 2017
  • Construction Completion: late Summer 2017 est.
  • Construction Cost: TBD