Current Status

10/17/16: Right-of-way clearing will begin this fall/winter with construction beginning in the spring of 2017.

Project Location

The small structure is located on Deer Walk Dr. off of Joyce Ave. in White River Township
Reason for Project
Deterioration has occurred at the joints and invert of the pipe.

Project Scope

Proposed design will keep the same roadway width and length. Structure will be able to accommodate a Q100 flood event.

Construction Details
  • Design Firm: Beam. Longest & Neff
  • Contractor: TBD
  • Construction Start Date: March 2017
  • Construction Completion: late Summer 2017 est.
  • Construction Cost: TBD