Current Status


8/8/17: The construction contract has been awarded to Hoosier Pride Excavating. Construction is expected to begin on August 14th.

Project Location


The small structure is located on Deer Walk Dr. off of Joyce Ave. in White River Township.

Reason for Project
Deterioration has occurred at the joints and invert of the pipe.

Project Scope


Proposed design will keep the same roadway width and length. Structure will be able to accommodate a Q100 flood event.

Construction Details


  • Design Firm: Beam. Longest & Neff
  • Contractor: Hoosier Pride Excavating
  • Construction Start Date: August 14, 2017
  • Construction Completion: October 14, 2017
  • Construction Cost: $280,835* (does not include design or right-of-way costs)