4/23/19: Right-of-way clearing is underway. Construction is expected to begin later this spring.

Project Location


Structure #33044 is located on Joyce Ave. over an unnamed stream between Strawtown Ave. and 241st St. in White River Township.

close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel

Reason for Project


The existing structure is a 3-sided precast concrete arch with chip & seal roadway.  Deterioration has occurred at various locations along the structure.  Currently, the geometry of the structure is one lane with s-curves on both sides.

Project Scope


Proposed design will widen the roadway and structure to two 12 foot lane and 4’ shoulder.  The roadway will improve sight distance along the curve.  The new structure will be able to accommodate Q100 flood event with additional 2 feet of free board for flood events.

Construction Details


  • Design Firm: Hanson Professional Services
  • Inspection Firm: Hamilton County Highway Department
  • Contractor: TBD
  • Construction Start Date: Spring 2019
  • Construction Completion: Fall 2019
  • Construction Cost: TBD

Funding


This project will be funded using revenue from the County Option Income Tax fund.