Reason for Project
The two small structures are within a close proximity of each other, and the necessity of the second structure will be evaluated during the design process. The existing geometry of both structures are two lanes with stone shoulders. Deterioration has occurred on both structures at various locations.
Project Scope
The proposed design will replace SS #33016 and eliminate SS #33017. The new structure geometry shall be two 12-foot lanes, 4’ shoulders, will accommodate a Q100 flood event, and meet current design standards.
Construction Details
- Design Firm: Hanson Engineering
- Inspection Firm: Hamilton County Highway Department
- Contractor: TBA
- Construction Start Date: August 2021
- Construction Completion: late Fall 2021
- Construction Cost: TBA
Funding
Local funding