Structure #22013 - 196th St. over unknown stream

Project Information


Current Status


5/12/21: Bids are now being accepted for the construction contract. Construction is expected to begin this summer. 

Project Location


Structure #22013 is located on 196th Street over an unnamed stream between Promise Rd. and Summer Rd. in Noblesville Township.

close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel
close carousel

Reason for Project


The structure has suffered section loss at various locations along the barrel and has a separated wingwall.

Project Scope


The proposed design will widen the roadway and shoulder. The new structure will be elevated and able to accommodate a 100-year flood event.

Construction Details


  • Design Firm: Stephen J. Christian & Associates
  • Inspection Firm: Hamilton County Highway Department
  • Contractor: TBD
  • Construction Start Date: Summer 2021
  • Construction Completion: Fall 2021
  • Construction Cost: $715k

Funding


This project will be funded using revenue from the County Option Income Tax fund.