Bridge 219 carries Greenfield Ave. over Stony Creek.
Reason for Project
The bridge deck and approach slabs are deteriorated. A bridge deck overlay is recommended.
Project Scope
Bridge Rehabilitation – The bridge approach slabs will be replaced, the south bridge coping will be reconstructed, and a new overlay will be constructed on the bridge deck.
Construction Details
Design Firm: Infrastructure Engineering
Inspection Firm: TBD
Contractor: TBD
Construction Start Date: Spring 2025
Construction Completion: Summer 2025
Construction Cost: TBD
Funding
Design and construction costs will be funded locally.