Bridge #219 - Greenfield Ave. over Wilson Ditch

Project Information

Current Status

9/13/23: Design is underway.

Project Location

Bridge 219 carries Greenfield Ave. over Stony Creek.

Google_StreetView Opens in new window

Reason for Project

The bridge deck and approach slabs are deteriorated. A bridge deck overlay is recommended.

Project Scope

Bridge Rehabilitation – The bridge approach slabs will be replaced, the south bridge coping will be reconstructed, and a new overlay will be constructed on the bridge deck.

Construction Details

  • Design Firm: Infrastructure Engineering
  • Inspection Firm: TBD
  • Contractor: TBD
  • Construction Start Date: Spring 2025
  • Construction Completion: Summer 2025
  • Construction Cost: TBD

Funding

Design and construction costs will be funded locally.