Reason for Project
The existing bridge is undersized and is deteriorating. Replacement is necessary.
Project Scope
Bridge Replacement – The existing bridge will be replaced with a new bridge that is sized to accommodate a 100 year storm event.
Construction Details
- Design Firm: Clark Dietz Eng.
- Inspection Firm: TBD
- Contractor: TBD
- Construction Start Date: Spring 2024
- Construction Completion: Summer 2024
- Construction Cost: TBD
Funding
Design and construction costs will be funded locally.