Current Status

11/6/23: Design is underway. Atlantic Rd. is currently closed until repairs are made to the bridge.

Project Location

Bridge 125 carries Atlantic Rd. over Stony Creek

Google_StreetView Opens in new window

Reason for Project

Deterioration and failure of existing bridge elements.


Project Scope

Replacement of the existing bridge and minor approach roadway reconstruction.


Construction Details

  • Design Firm: HWC
  • Inspection Firm: TBD
  • Contractor: TBD
  • Construction Start Date: TBD
  • Construction Completion: TBD
  • Construction Cost: TBD
Funding
Design and construction will be funded locally.