SS#33065 - Deer Walk Dr. over Webb Ditch

Project Information


Current Status


June 4, 2018: Construction is complete.

flickr photo album

Project Location


The small structure is located on Deer Walk Dr. off of Joyce Ave. in White River Township.

Reason for Project
Deterioration has occurred at the joints and invert of the pipe.

Project Scope


Proposed design will keep the same roadway width and length. Structure will be able to accommodate a Q100 flood event.

Construction Details


  • Design Firm: Beam. Longest & Neff
  • Contractor: Hoosier Pride Excavating
  • Construction Start Date: Spring 2018
  • Construction Completion: Summer 2018
  • Construction Cost: $280,835* (does not include design or right-of-way costs)