This project involves the construction of a multi-lane Roundabout at the intersection of 116th Street and Hazel Dell Parkway. Construction is expected to take at least 75 days.
Approach work will extend approximately 800 feet along north, south and east legs and approximately 700 feet along the west leg. Roundabout will have the following configuration:
- Southbound Approach (Hazel Dell Parkway) will be a three lane entry.
- Northbound Approach (Hazel Dell Parkway) will be a two lane entry with dual right-turn bypass lanes.
- Eastbound Approach (116th Street) will be a two lane entry.
- Westbound Approach (116th Street) will be a two lane entry with dual right-turn bypass lanes.
The proposed roundabout would be designed with sidewalks and multi-use paths. Crosswalks and ADA compliant ramps would be designed for each leg (at entry and exit locations). In addition, bike lane and bike ramps will be added on the west leg, tying into the existing roadway section. Multi use paths will be provided along the east and west sides of Hazel Dell Parkway and along the south side of 116th Street, east of the Intersection.